Heathrow Express

Heathrow Express High-Speed Airport Rail Link, United Kingdom

The Heathrow Express is a high-speed rail link which offers the fastest journey time between Heathrow Airport and central London - just 16 minutes.

This £350 million BAA project originated in 1993 as a joint venture between BAA and British Railways Board. A train operating company, Heathrow Express Ltd, formed to plan, operate and introduce Heathrow Express, took over the running of the service after the project was completed. This company is a wholly-owned subsidiary of BAA plc.

HEATHROW EXPRESS PROJECT

BAA has signed a 25-year agreement with Railtrack for the use of the 12-mile main line stretch from Paddington to Airport Junction near Hayes. Non-stop trains began running on 25 May 1998.

The service is unique among British railways, in being separate from the franchising arrangements under which private companies pay the infrastructure owner, Railtrack, to operate trains over its tracks.

Services are operated by a fleet of purpose-built trains, capable of travelling at 100mph, leaving Paddington every 15mins between 5.30am and 11.10pm.

INFRASTRUCTURE

For the first 12 miles, the route follows the Great Western Mainline to Airport Junction, near Hayes. Here, Heathrow Express trains leave the main line to enter a five-mile tunnel that sweeps underneath the heart of the airport. There are two stations, one serving Terminals 1, 2 and 3, and a second, four miles away, serving Terminal 4.

Paddington station, the London terminus, has two platforms dedicated to Heathrow Express, and full airline passenger and luggage check-in facilities. State-of-the-art ticket machines are installed at Heathrow and Paddington to provide multi-lingual, credit card and through-ticket purchasing facilities.

The main line station at Paddington is currently served by four London Underground lines (District, Circle, Metropolitan and Bakerloo). Railtrack is responsible for trackwork, signalling and electrification of the line, and will also provide signalling and telecommunications network in the tunnel section. A dedicated maintenance depot is provided at Old Oak Common in west London, north of the Great Western main line. BAA is responsible for the five-mile underground section from Airport Junction to Terminal 4, via the central area.

The £60 million tunnelling contract was awarded to Balfour Beatty Civil Engineering.

CLASS 332 TRAINS

Heathrow Express owns 14 Class 332 trains, engineered and built by Siemens Transportation Systems in Germany in partnership with CAF of Spain.

Commissioning work on the bogies, the 25kV 50Hz traction equipment, braking and auxiliaries was completed in November 1996. During trials the train reached speeds of 176km/h, 10% higher than the maximum commercial speed of 160km/h.

Each of the four-car sets seats around 230 people. Each carriage features considerable space for baggage, and all seats face the nearest baggage area. On-board telephones are installed.

Each passenger car is equipped with four television screens providing check-in and airline information. Disabled access to the carriages is eased by each carriage floor being level with each platform. There is one toilet including disabled facilities to every three carriages.

SIGNALLING/COMMUNICATIONS

The trains run under Railtrack's standard four-aspect colour light signalling. Each is fitted with the advanced warning system of audible signals in the driver's cab as it passes a signal.

They are also equipped with automatic train protection, the system which gives an indication of each signal aspect in the driver's cab, and in the event of a train passing a danger signal, automatically applies the brakes.

THAMESLINK 2000

Heathrow Express is looking to play a part in another major infrastructure improvement project for London's railways - Thameslink 2000. This envisages rail services linking all three of London's principal airports - Heathrow, Gatwick and Stansted - by electrifying two existing connections between lines to allow through running.

The airport could also see direct services from other parts of London and the north if plans to reinstate a former rail line along the M25 motorway towards Staines and Waterloo proceed.

Printable Version Click here for printable version



Expand Image
Heathrow Express route.
Heathrow Express route.
Expand Image
Construction work on the 5 mile tunnel section of the line under the airport.
Construction work on the 5 mile tunnel section of the line under the airport.
Expand Image
A completed section of the 5 mile tunnel.
A completed section of the 5 mile tunnel.
Expand Image
Heathrow Express trains run for much of their journey along the Great Western main line.
Heathrow Express trains run for much of their journey along the Great Western main line.
Expand Image
The trains' sliding doors, through which access onto and off of platforms is almost level.
The trains' sliding doors, through which access onto and off of platforms is almost level.
Expand Image
The Heathrow Express.
The Heathrow Express.
Expand Image
Heathrow Express passenger coach interior.
Heathrow Express passenger coach interior.


client logon
Home
Advertise With Us
Organisations
Events & Exhibitions
Newsletter
New On This Site
Atom FeedRSS Feed
What is RSS?