Westerschelde Tunnel Construction, Netherlands

 

Key Data:

Project name
Westerschelde Tunnel
Project type
Tunnel
Location
Zeeland, The Netherlands
Construction commenced
November 1997
Estimated completion date
November 2003
Estimated total construction costs (inc. tunnel and roads)
€726 million (1.6 billion guilders)

Technical details:

Tunnel length
6.6km
Deepest point
60km below the Amsterdam Ordnance Datum
Maximum slope
4.5%
Diameter
11m
Tunnel width
3.5m lanes in each tunnel
No. of tunnel ring segments
52,000

Tunnel Boring Machines (TBM):

Manufacturer
Herrenknecht
Length
185m
Construction timeframe
15 months
Installation timeframe
3 months
Average daily progress
12m
Boring operations material production
1.6m3