Westerschelde Tunnel

Specifications - Westerschelde Tunnel Construction, Netherlands


Key Data
Project nameWesterschelde Tunnel
Project typeTunnel
LocationZeeland, The Netherlands
Construction commencedNovember 1997
Estimated completion dateNovember 2003
Estimated total construction costs (inc. tunnel and roads)€726 million (1.6 billion guilders)
Technical details
Tunnel length6.6km
Deepest point60km below the Amsterdam Ordnance Datum
Maximum slope4.5%
Diameter11m
Tunnel width3.5m lanes in each tunnel
No. of tunnel ring segments52,000
Tunnel Boring Machines (TBM)
ManufacturerHerrenknecht
Length185m
Construction timeframe15 months
Installation timeframe3 months
Average daily progress12m
Boring operations material production1.6m3